|
VITOSHA
MOUNTAIN
 |
DRAGALEVSKI LIFT
 |
Type:
Chair Lift (with two seats) |
 |
Contact
Details:
 |
Lower Station: Tel.: 02 / 967 11 10 |
 |
Medial Station: Tel.: 02 / 967 11 25 |
|
 |
Technical Characteristics:
It
consists of two parts.
 |
The first one begins above Dragalevtsi District and ends
in Bay Krastyo Area. The lower lift station is on 925 m. altitude,
1000 m. away from the central square of Dragalevtsi District. The
upper is on 1370 m. altitude, the displacement is 445 m. This part
of the lift started working in 1956. The line length is 1775 m., the
trip lasts 17 min., and the capacity of the line is 300 persons per
hour. |
 |
The second part connects Bay Krastyo Area with Goli Vrah
Summit. It is constructed in 1968, its length is 1700 m. and the
displacement is 448 m. The lower lift station is next to the upper
one of the first part and the upper station is on 1818 m. altitude.
The trip lasts 15 min. and the capacity is 600 persons per hour. |
|
 |
instructions
(In Bulgarian),
instruction-1
(In Bulgarian) |
 |
Work Time:
 |
Summer 2008
(Photo
- in Bulgarian):
 |
9,00–18,00 (on Thursday, Friday,
Saturday and Sunday) |
 |
The ride morning from:
 |
Lower Station: 9,00 h. |
 |
Goli Vrah Summit Station: 9,30 h. |
|
 |
Evening the last ride from:
 |
Goli Vrah Summit Station: 17,30 h. |
 |
Lower Station: 17,00 h. |
|
|
 |
Winter: |
|
 |
Prices:
Towards August 2008 the prices were as follows(Photo
- in Bulgarian):
 |
For the first
part of the lift it is 2,00 lv. (one-way
ticket).
Children under 14 years and pensioners
over
60
years pay
1,00 lv.
for one-way ticket.
|
 |
For
the second part
of the lift it is
2,00 lv.
(one-way
ticket).
Children under 14 years and pensioners
over
60
years pay
1,00 lv.
for one-way ticket.
|
 |
For
two parts
of the lift it is
3,00 lv. (one-way
ticket:
Dragalevtsi District-Goli
Vrah Summit
or
Goli Vrah Summit-Dragalevtsi
District).
Children under 14 years and pensioners
over
60
years pay 2,00 lv.
for one-way ticket. |
 |
Season ticket for all-day: 10,00 lv.
|
 |
Season ticket for half-day: 7,00 lv.
|
|
 |
Starting Points
to the lower lift station:
 |
The
center in Dragalevtsi District (by bus No 64, connecting Hladilnika
Bus Station with the Hygiene Center (on Akad. Ivan Geshov
Blvd.) –
15-20 min. |
 |
Hladilnika Bus Station (buses No 83, 88, 120, Trams No 9, 10) – by
bus No 93 |
|
 |
Staring Points
from the upper lift station:
 |
Of
the first part:
 |
Aleko Chalet (3,480 km.) - 1,15 h. |
 |
Kamen Del Chalet (4,440 km.) - 1,20 h. |
 |
Cherni Vrah Summit (7,100 km.) - 2,30 h. |
|
 |
Of the second part:
 |
Aleko Chalet (800 m.) - 0,15 h. |
 |
Cherni Vrah Summit (3,500 km.) - 1,30 h. The route is marked with 178
metal rods, painted in yellow and black, which allows safe
passing even in the winter |
 |
Tintyava Chalet (through Plateau) – 1,30 h. |
|
|
 |
Host Association:
Vajeni Linii JSC, Management – Simeonovo Lift
Station, tel.: 02 / 961 21 89, 961 20 77,
Web-site |
|
 |
SIMEONOVSKI LIFT
 |
Type:
Cabin Lift (with six seats each) |
 |
Contact Details:
tel.: 02 / 961 21 89 |
 |
Technical Characteristics:
This is the longest tourist rope way in Bulgaria. Its length is 6270
m. The displacement is 1083 m., the trip lasts 30 min and the
capacity of the line is 1500 persons per hour. It is constructed for
Universiada ’83 by the Austrian Company “Dopelmayer”
(Web-site)
and is
inaugurated on April 4, 1983. The lower lift station (First) is in the lands
of Simeonovo District on 727 m. altitude. At the first medial
station (Second and Third in one building), on 1377 m., ends the first part of the rope line. Here the
cabins are taken by second rope, so the tourists do not descend to
take the other lift. The doors open automatically and those who like
may go up or down. On the second medial
station (Fourth, 1520 m. altitude) only the
cabins going upward pass through. During the winter skiers descend
here to take
the three-seats-rope way “Akademika”,
serving Vitoshko Lale Ski-run. The upper lift station (Fifth) is on the same
altitude with Aleko Chalet – 1810 m. |
 |
Work
Time:
 |
Summer: 8,30 to 18.30 h. (on Friday) 8.30 to 19.00 h. (on Saturday and Sunday) |
 |
Winter: |
|
 |
Prices:
Towards July 2007 one-way ticket costs 3,50 lv. and return ticket is
6,00 lv. Children under 14 years and pensioners pay
1,50 lv. for one-way ticket (return
ticket costs 2,50 lv.).
Children under 7 years do not pay fees.
For a dog the fee is 1,50
lv. for one-way ticket
and for
a bike - 6,00
lv. From ²V-ta
(Fourth)
to V-ra (Fifth)
lift station - 1,00 lv.,
from ²²-ra (Second)
to ²-va (First)
and from ²²²-ta
(Third)
to V-ta (Fifth)
lift station - 1,50 lv. |
 |
Starting Points
to the lower lift station:
Special buses
 |
From Darvenitsa Bus Station (opposite Forestry Technical
University, Buses No 88, 280, 413) go to it – by bus No
123 |
 |
From Hladilnika Bus Station (Buses No 83, 88, 120, Trams 9,
10) – by bus No 122 |
 |
For those living in Lyulin, Ovcha Kupel and Mladost Districts
bus No 111 is very suitable. They have to go down on the
crossroad on the Circular Road with Bistrisho Road and then to
go on foot |
|
 |
Starting Point
from the upper lift station:
 |
Aleko Chalet – next to it |
 |
Cherni Vrah Summit – 1,30 h. |
 |
Tintyava Chalet – 1,30 h. |
 |
Akademik Training Base (through Mecha Polyana Area) – 2,00 h. |
 |
From Aleko Chalet begins the Bulgarian part of the
international route E-4 (Vitosha, Verila, Rila and Pirin
Mountains) |
|
 |
Host Association:
Vajeni Linii JSC, Management – Simeonovo Lift
Station, tel.: 02 / 961 21 89, 961 20 77,
Web-site |
|
 |
ROMANSKI LIFT
Photo
 |
Type: Chair Lift (with two seats) |
 |
Contact Details:
tel.: 02 / 967 11 11 |
 |
Technical Characteristics:
The lift begins from Prostor Hotel, near the place where is the monument
of Pavel Romanski – a skier who died on January 18, 1931 in a snowstorm.
The rope way is constructed in 1968, its length is 1930 m., and the
displacement is 500 m. The lower lift station is on 1650 m. altitude,
and the upper one is on 2150 m., next to Malak Rezen Summit. The trip
lasts 13 min and the capacity is 600 persons per hour. Very close to
Aleko Chalet, above the path for Mecha Polyana Area, is built a platform
for those who like to take the lift. This is very suitable for those who
come from
Simeonovski and
Dragalevski Lift to continue their
trip to Cherni Vrah Summit. |
 |
Work
Time:
 |
Summer: 9.00 to 16.45 h. (on Saturday and Sunday) |
 |
Winter: |
|
 |
Prices:
Towards
January 2007 the ticket is 6,00 lv. (July 2007 - 4,00 lv.), for children
under 14 years - 4,00 lv. and for pupils, students and pensioners
- 5,00 lv. |
 |
Starting Points to the lower lift station:
 |
Prostor Hotel Station (up to where one have to go by bus No 66
(from Hladilnika Bus Station)). During the winter the lift is
used mainly by skiers as here ends the “blue” Romanski Ski
Run. |
|
 |
Starting Point from the upper lift station:
 |
Cherni Vrah Summit (1,300 km.) - 0,30 h. The route is marked
with 46 metal rods, painted in black and yellow, which allows
safe trips during the winter. |
|
 |
Host Association: "Vitosha
Ski"
JSC |
|
 |
AKADEMIKA_LIFT
 |
Type:
Chair Lift (with three seats) |
 |
Technical Characteristics:
This
lift serves those who run on Vitoshko Lale Ski Run. It is constructed
for Universiada ’83 by the Austrian Company “Dopelmayer”
(Web-site).
The lower lift
station is on 1500 m. altitude, where the Ski Run ends. The lift consist
of two parts (Vitoshko Lale-1 and Vitoshko Lale-2): the first one has 1340 m. length and 400 m. displacement;
its capacity is 1500 persons per hour. The second part has 1280 m.
length and 370 m. displacement. Its capacity is smaller – 900 persons
per hour, due to the fact skiers descend on the medial station. The
upper lift station is to Golaym Rezen Summit, on 2270 m. altitude. |
 |
Prices:
Towards
January 2007 the ticket is 6,00 lv., for children under 14 years - 4,00
lv. and for pupils, students and pensioners
- 5,00 lv. |
 |
Work
Time:
Only
during the ski season |
 |
Stating
Point to the lower lift station:
 |
It can be reached when one descends on the second medial
station of
Simeonovski Lift. |
|
 |
Starting Point
from the upper lift station:
 |
Golyam and Malak Rezen Summit |
 |
Cherni Vrah Summit |
|
 |
Host Association: "Vitosha
Ski"
JSC |
|
 |
KNYAJEVSKI
LIFT
Photo,
Photo1
 |
Type:
Cabin
Lift |
 |
Contact Details:
- |
 |
Technical Characteristics:
It is
constricted in 1962 by the Austrian Company “Bratya Girak” and it is the
first cabin lift in Bulgaria. The lower lift station is in Knyajevo
District on 744 m. altitude and its final station is on Kopitoto Summit
on 1348 m. altitude, next to the 160m. TV tower. The length of the line
is 1900 m. and the trip lasts (more precisely lasted) 11 min. The
capacity is 600 persons per hour. |
 |
Starting Point
to the lower lift station:
 |
Knyajevo District – 800 m. from the final station of tram No 5 |
|
 |
Starting Point
from the upper lift station:
 |
Momina Skala Chalet – 1,840 km. |
 |
Zlatni Mostove Center – 3,330 km. |
|
 |
Host Association:
Vajeni Linii JSC from
Capital Transport Company, Management – Simeonovo Lift
Station, tel.: 02 / 961 21 89, 961 20 77,
Web-site |
 |
NOTE:
Ten years ago there was a damage – the rope was torn and from then
this very suitable rope way does not work!!! |
|
|
|
PIRIN MOUNTAIN
 |
BANSKO - BANDERISHKA POLJANA
LIFT
Plan
 |
Type:
Cabin Lift (with eight seats each) |
 |
Technical Characteristics:
The
line is in regular exploitation from December 13, 2003. The lower lift
station is on 990-m. altitude, the medial station is in Chalin Valog
Area on 1490 m. altitude and the upper one is on 1590 m. in
Banderishka Poljana Area. The displacement is 600 m. and the capacity
of the line is 2400 persons per hour. |
 |
Starting Point
to the lower lift station:
 |
Town of
Bansko |
|
 |
Starting Point
from the upper lift station
(Banderishka Poljana Area):
 |
Banderitsa Chalet |
 |
Vihren Chalet |
 |
Banderitza Lift
|
|
 |
Host Association:
Ulen
JSC, Bansko,
Pirin Str.,
Strajite Hotel, tel.: 0749 / 8
89 15, GSM: 0888 / 68 69 50,
Web-site |
|
 |
BANDERITZA LIFT
Plan
 |
Type:
Chair Lift (with four seats) |
 |
Technical Characteristics:
The
lower lift station is on 1590-m. altitude in Banderishka Poljana
Area, the medial station is on 2193 m. altitude and the upper one is on
2548 m. below
Todorin Vrah Summit.
The
length of a lift is
2553 m. and the
displacement is
958 m. |
 |
Starting Point
to the lower lift station
(Banderishka Poljana Area):
 |
Cabin Lift |
|
 |
Starting Point
from the upper lift station:
 |
Todorin Vrah Summit (2746 m.) |
 |
Demyanitsa Chalet (through Todorin Vrah Summit) |
|
 |
Host Association:
Ulen
JSC, Bansko,
Pirin Str., Strajite
Hotel, tel.: 0749 / 8
89 15, GSM: 0888 / 68 69 50,
Web-site |
|
 |
STARATA PISTA LIFT
Plan
 |
Type:
Chair Lift (with four seats) |
 |
Technical Characteristics:
The
length of a lift is 800 m. and the displacement is 316 m. |
 |
Starting Point
to the lower lift station
(Banderishka Poljana Area):
 |
Cabin Lift |
|
 |
Starting Point
from the upper lift station:
 |
The ski runs |
|
 |
Host Association:
Ulen
JSC, Bansko,
Pirin Str., Strajite
Hotel, tel.: 0749 / 8
89 15, GSM: 0888 / 68 69 50,
Web-site |
|
 |
TODORKA LIFT
Plan
 |
Type:
Chair Lift (with three seats) |
 |
Technical Characteristics:
The
seats rope way is constructed in 1985 and its main purpose is to
serve the ski runs in the region.
The
length of a lift is
2336 m.,
its capacity is 800 persons per hour as the displacement of 706 m.
is tripped for 20 min. |
 |
Starting Point
to the lower lift station
(Shiligarnika Area):
 |
Town of Bansko – 9 km along asphalt road (2,00 h.) |
|
 |
Starting Point
from the upper lift station:
 |
Todorin Vrah Summit (2746 m.) |
 |
Demyanitsa Chalet (through Todorin Vrah Summit) |
|
 |
Host Association:
Ulen
JSC, Bansko,
Pirin Str., Strajite
Hotel, tel.: 0749 / 8
89 15, GSM: 0888 / 68 69 50,
Web-site |
|
 |
SHILIGARNIKA I LIFT
Plan
 |
Type:
Chair Lift (with four seats) |
 |
Technical Characteristics:
Its
main purpose is to serve the ski runs in the region.
The
length of a lift is 2606 m. and the displacement is 581 m. |
 |
Starting Point
to the lower lift station
(Shiligarnika Area):
 |
Town of Bansko – 9 km along asphalt road (2,00 h.) |
|
 |
Starting Point
from the upper lift station:
 |
The ski runs |
|
 |
Host Association:
Ulen
JSC, Bansko,
Pirin Str., Strajite
Hotel, tel.: 0749 / 8
89 15, GSM: 0888 / 68 69 50,
Web-site |
|
 |
SHILIGARNIKA II LIFT
Plan
 |
Type:
Chair Lift (with three seats) |
 |
Technical Characteristics:
Its
main purpose is to serve the ski runs in the region.
The
length of a lift is 2050 m. and the displacement is 480 m. |
 |
Starting Point
to the lower lift station
(Shiligarnika Area):
 |
Town of Bansko – 9 km along asphalt road (2,00 h.) |
|
 |
Starting Point
from the upper lift station:
 |
The ski runs |
|
 |
Host Association:
Ulen
JSC, Bansko,
Pirin Str., Strajite
Hotel, tel.: 0749 / 8
89 15, GSM: 0888 / 68 69 50,
Web-site |
|
 |
GOTSE DELCHEV CHALET –
BEZBOG CHALET LIFT
 |
Type:
Chair
Lift (with two seats) |
 |
Contact Details:
Through Dobrinishte
Hotel (tel.: 07447 / 21
20,
fax:
07447 / 21 28,
GSM: 0885 / 89
92 28)
or through
Bezbog Chalet (GSM:
0885 / 50 28
01) |
 |
Technical Characteristics:
The line is in regular exploitation from August 13, 1989. The lower
lift station is on 1485-m. altitude, next to Gotse Delchev Chalet. The
medial station is on 1894 m. altitude and the upper one is on 2227 m.,
near Bezbog Chalet. The displacement is 742 m. for 27-min. trip (the
first part – 13 min. and the second one – 14 min.). The capacity of
the line is 500 persons per hour. The length of the first part is 1514
m. and of the second one – 1731 m. |
 |
Work Time:
9.00 – 16.00 h. |
 |
Prices:
Towards July 2007 one-way ticket costs 4 lv. (for children - 2,00 lv.), as for the trip at
least 10 persons are necessary. If the tourists are less than 10, they
will pay the sum to 40 lv. If one goes up in the morning at the
beginning of the work time when the staff travels is very suitable,
because there is no minimum for passengers then. |
 |
Starting Point
to the lower lift station:
 |
Town of Dobrinishte (end rail way
station of the narrow-gauge line Septemvri - Dobrinishte)
– 11 km. along asphalt road (2,30 h.).
Transport -
through Dobrinishte
Hotel (tel.: 07447 / 21
20, fax:
07447 / 21 28,
GSM: 0885 / 89
92 28) - 3,00
lv. (July 2007)
or
taxi |
|
 |
Starting Points to the upper lift station:
 |
Tevno Ezero Shelter (through Kraledvorska Lyava Porta Area) –
3,45 h. |
 |
Demyalnitsa Chalet (through
Djengalskata (unpopular:
Samodivskata) Porta) - 5,00
h. |
 |
Pirin Chalet (through Jelezni Vrata Saddle) – 6,00 h. |
|
 |
Host Association:
"Sanset
rizort" Ltd.
(the Hotel in Town of
Dobrinishte (tel.: 07447 / 21
20, fax:
07447 / 21 28,
GSM: 0885 / 89
92 28), Gotse Delchev
Chalet, Bezbog Chalet, the lift Gotse Delchev Chalet - Bezbog
Chalet),
Å-mail,
Web-site |
|
 |
AKADEMIKA (CARNA MOGILA,
LEDNIKA) LIFT
Plan
 |
Type:
Chair Lift (with two seats) |
 |
Technical Characteristics: It is designed to serve the ski run on Tsarna Mogila
Ridge.
The
length of a lift is
2412
m., the displacement is 887 m. and its capacity is 500 persons per hour |
 |
The
lower lift station is in Banderishka Poljana Area and the upper one is in
Carna Mogila Peak. |
 | | |